COMPASS Project Performance Measure Scoring Tool

Total Weighted CRS Score

-
CategoryWeightScore
Walk--
Bike--
Transit--
VMT--
Low Speed Modes--
LTS Score--
Vehicle Operating Cost--
Carbon Emissions--
Safety--
Heavy Truck Delay--
Heavy Truck VMT--
Arterial Delay--
Freeway Delay--

Selection

Analysis Zone Selected
Click zones on the map to add/remove them from the selection.
More Info: Total Selected Zone Trip Growth Potential
Baseline (2050) Pedestrian Trips-
Potential Additional Pedestrian Trips-
Baseline (2050) Bicycle Trips-
Potential Additional Bicycle Trips-
Baseline (2050) Transit Trips-
Potential Additional Transit Trips-
Potential 2025 to 2050 multimodal trip growth based on Visioneval Scenarios

Project Category Selection

Check boxes to pick project categories and input project characteristics

Safety Parameters

Enter a percentage (0-100).
Safety Score-

Pedestrian Project Length (ft)

PLTS = Pedestrian Level of Traffic Stress. Improvement is the change between the new LTS and the current LTS for the facility.

Project Pedestrian Trips (2050)

Total Walk Network-
Total Trips Added-
% Trip Increase-
Walk Score–
ZonePotentialTrip2050Ped

Bike Project Length (ft)

BLTS = Bike Level of Traffic Stress. Improvement is the change between the new LTS and the current LTS for the facility

Project Bicycle Trips (2050)

Total Bike Network-
Total Trips Added-
% Trip Increase-
Bike Score–
ZonePotentialTrip2050Bike

Transit Project Headway (min)

If the headway varies input the average in minutes.

Project Transit Trips (2050)

Average Baseline Headway-
Total Trips Added-
% Trip Increase-
Transit Score-
ZonePotentialTransitHeadwayLong2050Transit

LTS Combined Result

LTS Score -

VMT Reduction

Sum VMTReduce (selected)-
Total Final Trips (all modes)-
Sum Potential Trips (all modes)-
Estimated VMT Reduced–
Sum VMTBase-
Percent VMT Reduced–
VMT Score-

Low Speed Travel Modes

Total Trips–
Percent–
Score–

Vehicle Operating Cost Savings

Annual Cost Reduction Per Person–
Percent Reduced–
Score-

Carbon Emissions

Tons of CO2 Equivalents Reduced–
Percent Reduced–
Score-

About

This tool was Developed by DKS Associates for the Community Planning Association of Southwest Idaho for jusridisctions to easily assess how proposed projects meet regional goals
COMPASS logo

TSMO Projects

Project Details

Name-
Category-
Maximum of 6 projects selected.

Selected Projects

CategoryProjectRemove

Scoring Matrix

Goal Objective Performance Measure Percent